submain

Filter by:

Source
State or Territory
1 result for submain
Back

submain

HB50
circuit originating at a switchboard to supply another switchboard
The origin of the submains is deemed to be at the connecting devices of the neutral bar or link or at the load terminals of the circuit protective devices provided within or on a switchboard specifically for the connection of the submains. The termination of the submains is deemed to be at the supply terminals of the other switchboard.