fire-resistance-period

Filter by:

Source
State or Territory
1 result for fire-resistance-period
Back

fire resistance period

Also called: FRP
Standards
time, in minutes, for a member to reach the appropriate failure criterion, specified in AS 1530.4, if tested in accordance with that Standard
Source - AS 1720.4:2006: Timber structures
Standards
time, in minutes, for a member to reach the specified failure criteria (i.e. structural adequacy, integrity and/or insulation) if tested for fire in accordance with the appropriate Standard
For structures that need to conform with the BCA requirements, the appropriate Standard is AS 1530.4 .
Source - AS 3600:2018: Concrete structures
Standards
time, in minutes, for a member to reach the appropriate failure criteria (i.e. structural adequacy, integrity and/or insulation) if tested for fire in accordance with the appropriate Standard
Where the Building Authority references the Building Code of Australia, the appropriate Standard is AS 1530.4 .
Source - AS 3600:2018: Concrete structures
HB50
time, in minutes, for an building element to reach the relevant failure criterion, when tested in accordance with AS 1530.4