defects-liability-period
Filter by:
Source
State or Territory
Back
defects liability period
HB50
specified period of time within which the contractor is required, at the contractor’s own cost, to rectify any defects in the completed works arising due to faulty materials or workmanship and notified in writing
The period commences from the date of issue of the ‘certificate of practical completion’ and lasts for the period stated in the contract.

