as-built-drawing
Filter by:
Source
State or Territory
Back
as-built drawing
Also called: as-constructed drawing, as-executed drawing, works-as-executed drawing
HB50
drawing used to record the details of a construction following its completion
Specifically it records all changes made from the contract drawings.
See also: contract drawings